• Ambassa-Visitors

    • 88,385 hits
  • Site Meter
    Click here to see from where: Geo Visitors Map

  • Welcome



    Welcome to the Ambassablog! We're the front-line employee bloggers of the San Diego County Regional Airport Authority and participants in the Airport Authority's Goodwill Ambassador Program.

    Here you'll find our continually updated posts about life at historic San Diego International Airport (Lindbergh Field).

    Take a look around, and Email us if there's something you'd like to see added to the Ambassablog or covered in future posts.
  • Recent Comments

  • Top 5 Posts

  • Most Recent Posts

  • Post Categories

  • Ambassa-Archives

  • Contact

    For questions or information about this blog and other social media tools used by San Diego International Airport, contact:
    Steven Shultz, M.S.
    Deputy Director, Public & Community Relations /
    San Diego County Regional Airport Authority: sshultz@san.org

There’s construction work to be had at SDIA

If you are a local small business in the construction industry and motivated to learn, there may be work for you at the San Diego International Airport.

JJ Hawes Inc., a small general contracting firm with 11 employees, can attest to that. Owner Jess Hawes registered with The Green Build in 2009. He took advantage of programs offered by the Airport Authority’s Small Business Development team and attended the Turner School of Construction Management (TSCM). Both programs are intended to help small businesses grow their business capacities.

A two-month course hosted at the Airport Authority, TSCM helps prepare small and emerging local businesses to take on larger jobs.  The courses are taught mainly by Turner’s senior management. It also includes an introduction to the programs offered by Small Business Development to help small and disadvantaged local businesses gain work at the airport. Finally, it provides a unique opportunity to network with other local contractors.

Jess says the course “created a new life experience.” He worked diligently to learn the ins and outs of working with the airport and successfully bid as a subcontractor to Turner/PCL/Flatiron Joint Venture, the contracting team for The Green Build. The bid package was part of  Contract 1, which includes 10 new gates at Terminal 2 West, expanded dining and shopping options, and other terminal and airfield improvements.

Jess’ job was to remove, intact, several large pieces of glass on the west end of Terminal 2 West and install temporary partitions. To avoid any impact to SDIA passengers, work was conducted from 10 p.m. to 4:30 a.m. Jess also had to remove one of the airport’s largest art pieces, Sunlight Juxtaposed, a giant glass mosaic by Joan Irving. The art has been safely stored away and will return in 2013. Right now, if you head up the escalator to the TSA security lanes at the west end of Terminal 2 West, you’ll barely notice the huge partition now in place in the west wall.

Contract 1’s Project Director, Dan McGuckin, and Security Director, Scott MacDonald, both say Jess was a great team player, “working conscientiously and going the extra step.”  He ensured that not just the art was kept safe, but that his crew went home safely at the end of each shift.

Jess plans to bid on more work – and both Turner/PCL/Flatiron and the Airport Authority hope he does!

To get a closer look at Jess’ work, check out the cool time-lapse video above.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: